Air Conditioning Parts and Supplies
7/1/2015 and After
6/30/15 and After
Recommended Fuse - 40A
10/10/16 and After
10/9/16 and Before
Includes Compressor, Receiver Drier, Expansion Valve and O-Rings
Includes Compressor, Condenser, Receiver Drier, Expansion Valve and O-Rings
5/14/2021 and After
5/13/2021 and Before
Parallel Flow, Non-Serviceable Design
Square 4 Pin Configuration
Standard Fin Density
Low Fin Density
3/2/2014 and Before
3/3/2014 and After